Frame-panel house building costs
|
Sale of frame and wooden houses. The Zorya Company offers construction of houses and cottages using individual projects, the price of which shall be adjusted according to the complexity of the architectural concept. We offer hereinafter a calculation of the frame-panel structure based on the below house construction project.Sale and prices of wooden and frame-panel houses. |
 |
Frame-panel house costs.Prices for construction of a house with the area of 166 sq.m., residential area of 94.5 sq.m. |
| |
Covered case |
budget variant finishing included |
business variant finishing included |
| Price for 1 sq.m, USD. |
210 |
600 |
750 |
| Fundament (monolithic slab) |
- |
+ |
+ |
| frame material |
pinewood OSB |
pinewood OSB |
pinewood OSB |
| wall thickness |
150 |
265 |
273 |
| heating insulator |
140 mm |
140 mm |
150 mm |
| windbreaker, hydroinsulation |
+ |
+ |
+ |
| vapor insulation |
- |
+ |
+ |
| external finishing |
- |
for beam, pinewood |
whitewashing |
| internal finishing |
- |
vagon, pinewood |
plasterboard, wallpaper |
| design work |
+ |
+ |
+ |
| stud 1 floor/mansard, cm |
295/255 |
290/250 |
290/250 |
| room floor cover |
OSB |
laminated material |
laminated material |
| WC floor cover |
- |
glazed tile |
glazed tile |
| ceiling finishing |
lathing |
batten (pinewood) |
plasterboard |
| windows |
- |
metal-filled plastic (1 bag) |
pinewood (2 bag) |
| interior doors |
- |
medium density fibreboard |
wood (pinewood) |
| plumbing fixtures |
- |
+ |
+ |
| electric mains |
- |
+ |
+ |
| staircase |
- |
pinewood |
pinewood |
| heating |
- |
electric |
electric |
| roof frame lathing |
OSB |
OSB |
OSB |
| roofing (soft rooftiles) |
- |
+ |
+ |
| delivery of constructions and materials to the construction site |
- |
+ |
+ |
| renting of hoisting equipment |
- |
- |
- |
| Travel expenses |
- |
- |
- |
| Fencing, construction site security |
- |
- |
- |
| Exterior engineering lines connection |
- |
- |
- |
| Performance time, week days |
14-30 |
70 |
130 | |
The contract work fee structure:
- advanced payment for the installation of the foundation and the case (100 pct of the material costs, 70 pct of the labor costs); - additional payment after signing the acceptance act for the foundation and the case (30 pct of the labor costs); - payment for delivery, based on the incurred expenses (coordinated with the customer); - advanced payment for finishing materials (100 pct); - advanced payment for finishing labor (70 pct); - additional payment for finishing labor (during 3 days following the signing of the acceptance act);
|
| Roof construction. Price, USD (including VAT) |
| Description |
Measured surface |
Wooden structured |
Wooden structures in set |
Roofing made of soft roofing tile |
| Ordinary span roof |
slope-based area, sq.m. |
30 and more |
50 and more |
120 and more |
| Ordinary hipped roof |
slope-based area, sq.m. |
38 and more |
59 and more |
140 and more |
| Complex multi-gable cold roof |
slope-based area, sq.m. |
60 and more |
85 and more |
170 and more |
| Load-carrying frame, trusses, wallplate |
|
+ |
+ |
+ |
| Truss connections |
|
+ |
+ |
+ |
| Windboard |
|
+ |
+ |
+ |
| 12 mm OSB |
|
- |
+ |
+ |
| Hydroinsulation |
|
- |
- |
+ |
| Carpet pallet |
|
- |
- |
+ |
| Soft bitumen roofing tile Shinglas |
|
- |
- |
+ | |
| Mansard roof construction. Price, USD (including VAT) |
| Description |
Measured surface |
Wooden structures |
Wooden Structure Installation Work |
| Mansard floor frame, without heating insulation, OSB, hydroinsulation, cover |
Horizontal projection area, sq.m. |
67 - 85 |
30...60 |
|